{"id":17143,"date":"2021-07-14T16:51:12","date_gmt":"2021-07-14T14:51:12","guid":{"rendered":"https:\/\/www.flynex.io\/news\/three-ways-to-flight-authorization-2-the-operational-permit\/"},"modified":"2021-07-27T10:56:25","modified_gmt":"2021-07-27T08:56:25","slug":"three-ways-to-flight-authorization-2-the-operational-permit","status":"publish","type":"post","link":"https:\/\/www.flynex.io\/en\/news\/three-ways-to-flight-authorization-2-the-operational-permit\/","title":{"rendered":"Three Ways to Flight Authorization:<br>2. The Operational Permit"},"content":{"rendered":"<p><div class=\"fusion-fullwidth fullwidth-box fusion-builder-row-1 fusion-flex-container nonhundred-percent-fullwidth non-hundred-percent-height-scrolling\" style=\"--awb-border-radius-top-left:0px;--awb-border-radius-top-right:0px;--awb-border-radius-bottom-right:0px;--awb-border-radius-bottom-left:0px;--awb-flex-wrap:wrap;\" ><div class=\"fusion-builder-row fusion-row fusion-flex-align-items-flex-start fusion-flex-content-wrap\" style=\"max-width:1248px;margin-left: calc(-4% \/ 2 );margin-right: calc(-4% \/ 2 );\"><div class=\"fusion-layout-column fusion_builder_column fusion-builder-column-0 fusion_builder_column_1_1 1_1 fusion-flex-column\" style=\"--awb-bg-size:cover;--awb-width-large:100%;--awb-margin-top-large:0px;--awb-spacing-right-large:1.92%;--awb-margin-bottom-large:19px;--awb-spacing-left-large:1.92%;--awb-width-medium:100%;--awb-order-medium:0;--awb-spacing-right-medium:1.92%;--awb-spacing-left-medium:1.92%;--awb-width-small:100%;--awb-order-small:0;--awb-spacing-right-small:1.92%;--awb-spacing-left-small:1.92%;\"><div class=\"fusion-column-wrapper fusion-column-has-shadow fusion-flex-justify-content-flex-start fusion-content-layout-column\"><div class=\"fusion-text fusion-text-1\"><p>The new EU drone regulation divides flights into different <a href=\"https:\/\/www.flynex.io\/news\/the-new-eu-drone-regulation-part-2-operation-categories\/\" target=\"_blank\" rel=\"noopener\">operating categories.<\/a> This means that as of this year, a distinction is made between flights in the categories &#8220;open&#8221;, &#8220;specific&#8221; and &#8220;certified&#8221;. The &#8220;open&#8221; category covers most (private) flights, for which authorities do not require a separate permit if all requirements are met.<\/p>\n<p>However, the commercial use of <span class=\"fusion-popover popover-1\" data-animation=\"1\" data-class=\"popover-1\" data-container=\"popover-1\" data-content=\"Unmanned Aircraft System\" data-delay=\"50\" data-placement=\"top\" data-toggle=\"popover\" data-trigger=\"hover\">UAS<\/span> is growing steadily. As these flights generally fall into the &#8220;specific&#8221; category, commercial operations are, therefore, flights requiring a permit with a few exceptions. Thus, flights in this category require a flight authorization, which can be applied for in the form of an <strong>operating declaration<\/strong>, <strong>operational permit<\/strong>, or <strong>operator&#8217;s certificate<\/strong>. In the last article, we already dealt with the <a href=\"https:\/\/www.flynex.io\/news\/three-ways-to-operational-authorisation-1-the-declaration\/\" target=\"_blank\" rel=\"noopener\">operating declaration<\/a>.<\/p>\n<p>This article is about the application for an <strong>operational permit<\/strong>. For this, an operating concept must be prepared, and a risk assessment of the project must be carried out. There are several options for the risk assessment, which we will explain in the following.<\/p>\n<\/div><ul style=\"--awb-line-height:27.2px;--awb-icon-width:27.2px;--awb-icon-height:27.2px;--awb-icon-margin:11.2px;--awb-content-margin:38.4px;\" class=\"fusion-checklist fusion-checklist-1 fusion-checklist-default type-icons\"><li class=\"fusion-li-item\" style=\"\"><span class=\"icon-wrapper circle-no\"><i class=\"fusion-li-icon fa-arrow-right fas\" aria-hidden=\"true\"><\/i><\/span><div class=\"fusion-li-item-content\">\n<p><strong><a href=\"#Das Betriebskonzept\" target=\"_self\" rel=\"noopener\">The Concept of Operations<\/a><\/strong><\/p>\n<\/div><\/li><li class=\"fusion-li-item\" style=\"\"><span class=\"icon-wrapper circle-no\"><i class=\"fusion-li-icon fa-arrow-right fas\" aria-hidden=\"true\"><\/i><\/span><div class=\"fusion-li-item-content\"><strong><a href=\"#Die Risikobewertung\" target=\"_self\" rel=\"noopener\">The Risk Assessment<\/a><\/strong><\/div><\/li><\/ul><\/div><\/div><div class=\"fusion-layout-column fusion_builder_column fusion-builder-column-1 fusion_builder_column_1_1 1_1 fusion-flex-column\" style=\"--awb-padding-left:40px;--awb-bg-size:cover;--awb-width-large:100%;--awb-margin-top-large:-25px;--awb-spacing-right-large:1.92%;--awb-margin-bottom-large:19px;--awb-spacing-left-large:1.92%;--awb-width-medium:100%;--awb-order-medium:0;--awb-spacing-right-medium:1.92%;--awb-spacing-left-medium:1.92%;--awb-width-small:100%;--awb-order-small:0;--awb-spacing-right-small:1.92%;--awb-spacing-left-small:1.92%;\"><div class=\"fusion-column-wrapper fusion-column-has-shadow fusion-flex-justify-content-flex-start fusion-content-layout-column\"><ul style=\"--awb-iconcolor:#005f87;--awb-line-height:27.2px;--awb-icon-width:27.2px;--awb-icon-height:27.2px;--awb-icon-margin:11.2px;--awb-content-margin:38.4px;\" class=\"fusion-checklist fusion-checklist-2 fusion-checklist-default type-icons\"><li class=\"fusion-li-item\" style=\"\"><span class=\"icon-wrapper circle-no\"><i class=\"fusion-li-icon fa-arrow-right fas\" aria-hidden=\"true\"><\/i><\/span><div class=\"fusion-li-item-content\">\n<p><strong><a href=\"#STS\" target=\"_self\" rel=\"noopener\">Standard Scenarios (STS)<\/a><\/strong><\/p>\n<\/div><\/li><li class=\"fusion-li-item\" style=\"\"><span class=\"icon-wrapper circle-no\"><i class=\"fusion-li-icon fa-arrow-right fas\" aria-hidden=\"true\"><\/i><\/span><div class=\"fusion-li-item-content\">\n<p><strong><a href=\"#PDRA\" target=\"_self\" rel=\"noopener\">Pre-Defined Risk Assessment (PDRA)<\/a><\/strong><\/p>\n<\/div><\/li><li class=\"fusion-li-item\" style=\"\"><span class=\"icon-wrapper circle-no\"><i class=\"fusion-li-icon fa-arrow-right fas\" aria-hidden=\"true\"><\/i><\/span><div class=\"fusion-li-item-content\">\n<p><strong><a href=\"#SORA\" target=\"_self\" rel=\"noopener\">Specific Operational Risk Assessment (SORA)<\/a><\/strong><\/p>\n<\/div><\/li><\/ul><\/div><\/div><div class=\"fusion-layout-column fusion_builder_column fusion-builder-column-2 fusion_builder_column_1_1 1_1 fusion-flex-column\" style=\"--awb-padding-top:60px;--awb-padding-right:60px;--awb-padding-bottom:40px;--awb-padding-left:60px;--awb-bg-color:rgba(36,142,197,0.2);--awb-bg-color-hover:rgba(36,142,197,0.2);--awb-bg-size:cover;--awb-width-large:100%;--awb-margin-top-large:20px;--awb-spacing-right-large:1.92%;--awb-margin-bottom-large:60px;--awb-spacing-left-large:1.92%;--awb-width-medium:100%;--awb-order-medium:0;--awb-spacing-right-medium:1.92%;--awb-spacing-left-medium:1.92%;--awb-width-small:100%;--awb-order-small:0;--awb-spacing-right-small:1.92%;--awb-spacing-left-small:1.92%;\"><div class=\"fusion-column-wrapper fusion-column-has-shadow fusion-flex-justify-content-flex-start fusion-content-layout-column\"><div class=\"fusion-text fusion-text-2\"><h2>How to proceed and what you need for an application<\/h2>\n<p>Anyone planning a flight in the &#8220;specific&#8221; category must first describe their operation in detail in the form of an operating concept (also known as ConOps). In the next step, a risk assessment is to be carried out to determine what risk the operating concept entails. Predefined scenarios have been created to reduce the workload for operators and authorities.<\/p>\n<p><span data-preserver-spaces=\"true\">The Standard Scenarios (STS) are the lowest-risk flight scenarios with firmly defined specifications, e.g., for flight altitude. The first step should always be to check whether one of the STS applies to the flight. If the project corresponds to one of the STS, a (detailed) risk assessment is not necessary. If this is the case, only an\u00a0<\/span><strong><span data-preserver-spaces=\"true\">operating declaration<\/span><\/strong><span data-preserver-spaces=\"true\">\u00a0must be submitted, containing the rough operating concept with the prescribed contents according to\u00a0<\/span><a class=\"editor-rtfLink\" href=\"https:\/\/eur-lex.europa.eu\/legal-content\/EN\/TXT\/PDF\/?uri=CELEX:32020R0639&amp;from=DE\" target=\"_blank\" rel=\"noopener\"><span data-preserver-spaces=\"true\">Appendix 5 of the Commission Implementing Regulation 2020\/639<\/span><\/a><span data-preserver-spaces=\"true\">.<\/span><\/p>\n<p><span data-preserver-spaces=\"true\">However, Standard Scenarios are not applicable until December 3, 2023. If Standard Scenarios do not apply, as it is currently the case, an application for <\/span><strong><span data-preserver-spaces=\"true\">operational permission<\/span><\/strong><span data-preserver-spaces=\"true\">\u00a0must be submitted to the responsible national aviation authority in the form of the elaborated operational concept and a risk assessment as PDRA (Predefined Risk Assessment) or SORA (Specific Operational Risk Assessment). The PDRA represents an extension of the STS with a somewhat higher risk. Therefore, only an abbreviated SORA risk assessment is required.<\/span><\/p>\n<\/div><div class=\"fusion-image-element \" style=\"--awb-margin-top:10px;--awb-margin-bottom:30px;--awb-caption-title-font-family:var(--h2_typography-font-family);--awb-caption-title-font-weight:var(--h2_typography-font-weight);--awb-caption-title-font-style:var(--h2_typography-font-style);--awb-caption-title-size:var(--h2_typography-font-size);--awb-caption-title-transform:var(--h2_typography-text-transform);--awb-caption-title-line-height:var(--h2_typography-line-height);--awb-caption-title-letter-spacing:var(--h2_typography-letter-spacing);\"><span class=\" fusion-imageframe imageframe-none imageframe-1 hover-type-none\"><a href=\"https:\/\/www.flynex.io\/wp-content\/uploads\/2021\/07\/Betriebskonzept_Kategorie_Speziell_ENG-scaled-e1626277369740-1200x1793.jpg\" class=\"fusion-lightbox\" data-rel=\"iLightbox[b455de8ef9370e7c731]\" data-title=\"Procedure of Flights in the &#8220;specific&#8221; category\" title=\"Procedure of Flights in the &#8220;specific&#8221; category\"><img decoding=\"async\" width=\"800\" height=\"1270\" alt=\"Procedure of Flights in the &quot;specific&quot; category\" src=\"https:\/\/www.flynex.io\/wp-content\/uploads\/2021\/07\/Betriebskonzept_Kategorie_Speziell_ENG.png\" data-orig-src=\"https:\/\/www.flynex.io\/wp-content\/uploads\/2021\/07\/Betriebskonzept_Kategorie_Speziell_ENG-800x1270.png\" class=\"lazyload img-responsive wp-image-16784\" srcset=\"data:image\/svg+xml,%3Csvg%20xmlns%3D%27http%3A%2F%2Fwww.w3.org%2F2000%2Fsvg%27%20width%3D%271266%27%20height%3D%272010%27%20viewBox%3D%270%200%201266%202010%27%3E%3Crect%20width%3D%271266%27%20height%3D%272010%27%20fill-opacity%3D%220%22%2F%3E%3C%2Fsvg%3E\" data-srcset=\"https:\/\/www.flynex.io\/wp-content\/uploads\/2021\/07\/Betriebskonzept_Kategorie_Speziell_ENG-200x318.png 200w, https:\/\/www.flynex.io\/wp-content\/uploads\/2021\/07\/Betriebskonzept_Kategorie_Speziell_ENG-400x635.png 400w, https:\/\/www.flynex.io\/wp-content\/uploads\/2021\/07\/Betriebskonzept_Kategorie_Speziell_ENG-600x953.png 600w, https:\/\/www.flynex.io\/wp-content\/uploads\/2021\/07\/Betriebskonzept_Kategorie_Speziell_ENG-800x1270.png 800w, https:\/\/www.flynex.io\/wp-content\/uploads\/2021\/07\/Betriebskonzept_Kategorie_Speziell_ENG-1200x1905.png 1200w, https:\/\/www.flynex.io\/wp-content\/uploads\/2021\/07\/Betriebskonzept_Kategorie_Speziell_ENG.png 1266w\" data-sizes=\"auto\" data-orig-sizes=\"(max-width: 1024px) 100vw, (max-width: 643px) 100vw, 1200px\" \/><\/a><\/span><\/div><div class=\"fusion-text fusion-text-3\"><p><code id=\"Das Betriebskonzept\"><\/code><\/p>\n<\/div><\/div><\/div><div class=\"fusion-layout-column fusion_builder_column fusion-builder-column-3 fusion_builder_column_1_1 1_1 fusion-flex-column\" style=\"--awb-bg-size:cover;--awb-width-large:100%;--awb-margin-top-large:40px;--awb-spacing-right-large:1.92%;--awb-margin-bottom-large:19px;--awb-spacing-left-large:1.92%;--awb-width-medium:100%;--awb-order-medium:0;--awb-spacing-right-medium:1.92%;--awb-spacing-left-medium:1.92%;--awb-width-small:100%;--awb-order-small:0;--awb-spacing-right-small:1.92%;--awb-spacing-left-small:1.92%;\"><div class=\"fusion-column-wrapper fusion-column-has-shadow fusion-flex-justify-content-flex-start fusion-content-layout-column\"><div class=\"fusion-text fusion-text-4\"><h2><strong>THE CONCEPT OF OPERATIONS (CONOPS)<\/strong><\/h2>\n<p><span data-preserver-spaces=\"true\">The authority approves drone flights in the category \u201cspecific\u201d in principle based on a concept of operations (abbreviated ConOps or also called operating manual), which is subjected to detailed risk analysis (<\/span><a class=\"editor-rtfLink\" href=\"#Die Risikobewertung\" rel=\"noopener\"><span data-preserver-spaces=\"true\">more on this below<\/span><\/a><span data-preserver-spaces=\"true\">). According to\u00a0<\/span><a class=\"editor-rtfLink\" href=\"https:\/\/eur-lex.europa.eu\/legal-content\/EN\/TXT\/PDF\/?uri=CELEX:32019R0947&amp;from=DE\" target=\"_blank\" rel=\"noopener\"><span data-preserver-spaces=\"true\">Article 11 of the new EU Drone Regulation<\/span><\/a><span data-preserver-spaces=\"true\">, all relevant technical and operational details must be provided within a ConOps to apply for a permit.<\/span><\/p>\n<p><span data-preserver-spaces=\"true\">The Concept of Operations is a process description that details everything about the flight plan and risk mitigation. Everything from the team to the equipment of the UAS is included. A detailed concept decisively increases the chances of a positive operational authorization. Important: An operational authorization is always applied in the federal state where the person or company is located. A permit is issued by the aviation authority responsible for the federal state (here, you can find a list of the\u00a0<\/span><a class=\"editor-rtfLink\" href=\"https:\/\/www.flynex.io\/aviation-authority\/\" target=\"_blank\" rel=\"noopener\"><span data-preserver-spaces=\"true\">State Aviation Authorities in Germany<\/span><\/a><span data-preserver-spaces=\"true\">).<\/span><\/p>\n<p>For an operational permit, a risk assessment must be carried out, the results of which can, in turn, determine the content of the operational concept. Accordingly, if the risk assessment still identifies potential risks that have not yet been addressed in the operating concept, the concept must be subsequently adapted.<\/p>\n<h3>What does a ConOps contain?<\/h3>\n<p><span data-preserver-spaces=\"true\">In cooperation with several state aviation authorities, the Federal Aviation Office (Luftfahrt-Bundesamt; LBA) has prepared a detailed template for the creation of a ConOps and a risk assessment. The template including the risk assessment according to SORA is available\u00a0<\/span><a class=\"editor-rtfLink\" href=\"https:\/\/www.flynex.io\/wp-content\/uploads\/2021\/07\/Anlage_zum_Antrag_D-FB_09__SORA_ConOps-1.docx\" target=\"_blank\" rel=\"noopener\"><span data-preserver-spaces=\"true\">here (only in German available)<\/span><\/a><span data-preserver-spaces=\"true\">.<\/span><\/p>\n<p>An excerpt from the template as an example of the structure and content of a ConOps (in German:)<\/p>\n<\/div><div class=\"accordian fusion-accordian\" style=\"--awb-border-size:1px;--awb-icon-size:16px;--awb-content-font-size:18px;--awb-icon-alignment:left;--awb-hover-color:#f9f9f9;--awb-border-color:#cccccc;--awb-background-color:#ffffff;--awb-divider-color:#e0dede;--awb-divider-hover-color:#e0dede;--awb-icon-color:#ffffff;--awb-title-color:var(--awb-custom16);--awb-content-color:#404040;--awb-icon-box-color:#333333;--awb-toggle-hover-accent-color:#9e9e9e;--awb-title-font-family:&quot;Source Sans Pro&quot;;--awb-title-font-weight:700;--awb-title-font-style:normal;--awb-title-font-size:18px;--awb-content-font-family:&quot;Source Sans Pro&quot;;--awb-content-font-style:normal;--awb-content-font-weight:300;\"><div class=\"panel-group fusion-toggle-icon-boxed\" id=\"accordion-17143-1\"><div class=\"fusion-panel panel-default panel-316797e1a27523964 fusion-toggle-no-divider fusion-toggle-boxed-mode\"><div class=\"panel-heading\"><h4 class=\"panel-title toggle\" id=\"toggle_316797e1a27523964\"><a aria-expanded=\"false\" aria-controls=\"316797e1a27523964\" role=\"button\" data-toggle=\"collapse\" data-parent=\"#accordion-17143-1\" data-target=\"#316797e1a27523964\" href=\"#316797e1a27523964\"><span class=\"fusion-toggle-icon-wrapper\" aria-hidden=\"true\"><i class=\"fa-fusion-box active-icon awb-icon-minus\" aria-hidden=\"true\"><\/i><i class=\"fa-fusion-box inactive-icon awb-icon-plus\" aria-hidden=\"true\"><\/i><\/span><span class=\"fusion-toggle-heading\">ConOps (Extract)<\/span><\/a><\/h4><\/div><div id=\"316797e1a27523964\" class=\"panel-collapse collapse \" aria-labelledby=\"toggle_316797e1a27523964\"><div class=\"panel-body toggle-content fusion-clearfix\">\n<p><strong>1.1 Einleitung<\/strong><\/p>\n<p><em>Platz f\u00fcr einleitende Worte, jedoch keine Pflicht.<\/em><\/p>\n<p><strong>1.2 Organisations\u00fcbersicht<\/strong><\/p>\n<p><strong>1.2.1 Sicherheit<\/strong><\/p>\n<ol>\n<li><em>a) Beschreibung der Integration von Sicherheitsvorkehrungen und vorhandenes Sicherheitsmanagement<\/em><\/li>\n<li><em>b) Angabe zus\u00e4tzlicher sicherheitsrelevante Informationen<\/em><\/li>\n<\/ol>\n<p><strong>1.2.2 Design und Produktion<\/strong><\/p>\n<ol>\n<li><em>a) Erkl\u00e4rung der Produktionsorganisation f\u00fcr UAS aus eigener Produktion <\/em><\/li>\n<li><em>b) Angabe von Informationen zum Hersteller f\u00fcr UAS aus nicht-eigener Produktion<\/em><\/li>\n<\/ol>\n<p><strong>1.2.3 Schulung des am Betrieb beteiligten Personals<\/strong><\/p>\n<ol>\n<li><em>a) Beschreibung der Schulungsorganisation<\/em><\/li>\n<li><em>b) Beschreibung der Qualifizierungen der an der ConOps beteiligten Personen<\/em><\/li>\n<\/ol>\n<p><strong>1.2.4 Wartung des UAS<\/strong><\/p>\n<ol>\n<li><em>a) Wartungsphilosophie<\/em><\/li>\n<li><em>b) Wartungsverfahren<\/em><\/li>\n<li><em>c) Wartungsorganisation (falls vorhanden)<\/em><\/li>\n<\/ol>\n<p><strong>1.2.5 Besatzung (beteiligte Personen des UAS Betriebs)<\/strong><\/p>\n<ol>\n<li><em>a) Ausf\u00fchrliche Beschreibung der Verantwortlichkeiten und Pflichten des Personals<\/em><\/li>\n<\/ol>\n<p><em>Personal: Fernpiloten, Boden- und Hilfspersonal<\/em><\/p>\n<p><em>Angaben: Name, Geburtsdatum und Ort, Qualifikation<\/em><\/p>\n<p><em>! Wichtig: Kompetenznachweise in Dokumentenliste beif\u00fcgen<\/em><\/p>\n<ol>\n<li><em>b) Verfahren zur Koordinierung mehrerer Besatzungsmitglieder<\/em><\/li>\n<li><em>c) Betrieb verschiedener UAS (ggf. einschr\u00e4nkende Wirkungen)<\/em><\/li>\n<li><em>d) Betreiberrichtlinien zu den Anforderungen an die Gesundheit der Besatzung, sowie alle Verfahren und Anleitungen zur Sicherstellung, dass der geplante Betrieb durch die Besatzung durchgef\u00fchrt werden kann<\/em><\/li>\n<\/ol>\n<p><strong>1.2.6 UAS Konfigurationsverwaltung<\/strong><\/p>\n<ol>\n<li><em>a) Beschreibung des Umgangs und der Verwaltung des Fernpiloten bez\u00fcglich \u00c4nderungen am UAS<\/em><\/li>\n<\/ol>\n<p><strong>1.2.7 Weitere Positionen und Informationen<\/strong><\/p>\n<ol>\n<li><em>a) Angabe von beteiligten Personen aus anderen Organisationen<\/em><\/li>\n<\/ol>\n<p><strong>1.3 Betrieb<\/strong><\/p>\n<p><strong>1.3.1 Beschreibung der Art des UAS Betriebes<\/strong><\/p>\n<ol>\n<li><em>a) Detaillierte Beschreibung der ConOps mit Bezug auf SORA<\/em><\/li>\n<\/ol>\n<p><em>Arten von Operationen<\/em><\/p>\n<p><em>Detaillierte Erkl\u00e4rung dar\u00fcber wie, wo und unter welchen Einschr\u00e4nkungen oder Bedingungen die Operationen durchgef\u00fchrt werden sollen <\/em><\/p>\n<p><em>Beschreibung des Betriebsvolumens einschlie\u00dflich der Boden- und Luftrisikopuffer<\/em><\/p>\n<p><em>! Wichtig: Relevante Diagramme, Abbildungen und andere Informationen zur Visualisierung und zum Verst\u00e4ndnis k\u00f6nnen hier aufgenommen werden<\/em><\/p>\n<ol>\n<li><em>b) Spezifische Angaben zur Art der Operationen (z. B. VLOS, BVLOS), zur zu \u00fcberfliegenden Bev\u00f6lkerungsdichte (z. B. von Personen entfernt, d\u00fcnn besiedelt, Versammlungen von Personen) und zur Art des zu verwendenden Luftraums (z. B. ein getrennter Bereich, vollst\u00e4ndig integriert)<\/em><\/li>\n<li><em>c) Beschreibung des Beteiligungsgrads der Besatzungsmitglieder und aller automatisierten oder autonomen Systeme, w\u00e4hrend jeder Flugphase<\/em><\/li>\n<\/ol>\n<p><strong>1.3.2 Normalbetrieb<\/strong><\/p>\n<ol>\n<li><em>a) Beschreibung der normalen Betriebsstrategie mit Sicherheitsma\u00dfnahmen, technische oder verfahrenstechnische Ma\u00dfnahmen, Schulung der Besatzung usw., die eingerichtet wurden, um UAS-Betrieb und Kontrolle \u00fcber den Betrieb zu gew\u00e4hrleisten<\/em><\/li>\n<li><em>b) Erkl\u00e4rung, dass alle Systeme normal und bestimmungsgem\u00e4\u00df funktionieren<\/em><\/li>\n<li><em>c) Erkl\u00e4rung des Betriebsablaufs innerhalb der genehmigten technischen, \u00f6kologischen und verfahrenstechnischen Grenzen<\/em><\/li>\n<\/ol>\n<p><strong>1.3.3 Standardvorgehensweisen<\/strong><\/p>\n<ol>\n<li><em>a) Beschreibung der normalen Betriebsverfahren<\/em><\/li>\n<li><em>b) Beschreibung der Sicherheitsverfahren f\u00fcr Fehlfunktionen oder abnormale Vorg\u00e4nge, sowie Notf\u00e4lle<\/em><\/li>\n<\/ol>\n<p><em>Meldeverfahren bei:<\/em><\/p>\n<p><em>&#8211; Sachschaden;<\/em><\/p>\n<p><em>&#8211; eine Kollision mit einem anderen Luftfahrzeug; oder<\/em><\/p>\n<p><em>&#8211; eine schwere oder t\u00f6dliche Verletzung (Dritte und eigenes Personal)<\/em><\/p>\n<ol>\n<li><em>c) Dokumentations- und Datenerfassungsverfahren: Beschreiben Sie, wie Aufzeichnungen und Informationen gespeichert und erforderlichenfalls der Unfalluntersuchungsstelle, der zust\u00e4ndigen Beh\u00f6rde und gegebenenfalls anderen staatlichen Stellen (z. B. der Polizei) zur Verf\u00fcgung gestellt werden<\/em><\/li>\n<\/ol>\n<p><strong>1.3.4 Betriebsgrenzen<\/strong><\/p>\n<p><em>Erkl\u00e4rung der spezifischen Betriebsbeschr\u00e4nkungen und -bedingungen <\/em><\/p>\n<p><em>Zum Beispiel:<\/em><\/p>\n<p><em>&#8211; Betriebsh\u00f6hen<\/em><\/p>\n<p><em>&#8211; horizontale Entfernungen<\/em><\/p>\n<p><em>&#8211; Wetterbedingungen<\/em><\/p>\n<p><em>&#8211; der anwendbare Flugleistungsumfang<\/em><\/p>\n<p><em>&#8211; Betriebszeiten (Tag und \/ oder Nacht)<\/em><\/p>\n<p><em>&#8211; Einschr\u00e4nkungen innerhalb der anwendbaren Klasse(n) des Luftraums usw.<\/em><\/p>\n<p><strong>1.3.5 Notfallplan (ERP \u2013 emergency response plan)<\/strong><\/p>\n<ol>\n<li><em>a) Beschreibung eines Reaktionsplans f\u00fcr den Fall eines Kontrollverlusts<\/em><\/li>\n<li><em>b) Verfahrensbeschreibung zur Begrenzung der Auswirkungen eines Absturzes<\/em><\/li>\n<li><em>c) Verfahrensbeschreibung f\u00fcr den Fall des Verlusts in Hinblick auf Absperrung\/Eind\u00e4mmung<\/em><\/li>\n<\/ol>\n<p><strong>1.4 Training der am UAS Betrieb beteiligter Personen (UAS Team)<\/strong><\/p>\n<p><strong>1.4.1 Allgemeine Informationen<\/strong><\/p>\n<ol>\n<li><em>a) Beschreibung der Prozesse und Verfahren zur Entwicklung und Aufrechterhaltung der erforderlichen Kompetenzen f\u00fcr die Mitwirkenden (d. h. jede am UAS-Betrieb beteiligte Person)<\/em><\/li>\n<\/ol>\n<p><strong>1.4.2 Erstausbildung und Qualifikation<\/strong><\/p>\n<ol>\n<li><em>a) Beschreibung der Prozesse und Verfahren zur Sicherstellung der Kompetenzen des UAS Teams und Erkl\u00e4rung der Qualifizierungssicherung<\/em><\/li>\n<\/ol>\n<p><strong>1.4.3 Verfahren zur Aufrechterhaltung der Qualifikation<\/strong><\/p>\n<ol>\n<li><em>a) Beschreibung der Prozesse und Verfahren zur Sicherstellung der erforderlichen Qualifikationen f\u00fcr die Ausf\u00fchrung der verschiedenen Arten von Aufgaben des UAS Teams und deren Weiterentwicklung<\/em><\/li>\n<\/ol>\n<p><strong>1.4.4 Flugsimulationstrainingsger\u00e4te<\/strong><\/p>\n<ol>\n<li><em>a) Beschreibung der Verwendung von Flugsimulationstrainingsger\u00e4ten zum Erwerb und zur Aufrechterhaltung der praktischen F\u00e4higkeiten der Fernpiloten (falls zutreffend)<\/em><\/li>\n<li><em>b) Beschreibung der Bedingungen und Einschr\u00e4nkungen im Zusammenhang mit einer solchen Schulung (falls zutreffend)<\/em><\/li>\n<\/ol>\n<p><strong>1.4.5 Schulungsprogramm<\/strong><\/p>\n<ol>\n<li><em>a) Beschreibung der entsprechend verwendeten Schulungsprogramme<\/em><\/li>\n<\/ol>\n<\/div><\/div><\/div><\/div><\/div><div class=\"fusion-text fusion-text-5\"><p><code id=\"Die Risikobewertung\"><\/code><\/p>\n<\/div><div class=\"fusion-text fusion-text-6\"><p>A complete and comprehensive list of all possible content items with explanations can be found under &#8220;Annex A to AMC1 to Article 11 (p. 57 ff.) of the <a href=\"https:\/\/www.easa.europa.eu\/sites\/default\/files\/dfu\/Easy%20Access%20Rules%20for%20Unmanned%20Aircraft%20Systems.pdf\" target=\"_blank\" rel=\"noopener\">Easy Access Rules for Unmanned Aircraft Systems (June 2021)<\/a> published by the <span class=\"fusion-popover popover-2\" data-animation=\"1\" data-class=\"popover-2\" data-container=\"popover-2\" data-content=\"European (Union) Aviation Safety Agency\" data-delay=\"50\" data-placement=\"top\" data-toggle=\"popover\" data-trigger=\"hover\">EASA<\/span>.<\/p>\n<\/div><\/div><\/div><\/div><\/div><div class=\"fusion-fullwidth fullwidth-box fusion-builder-row-2 fusion-flex-container nonhundred-percent-fullwidth non-hundred-percent-height-scrolling\" style=\"--awb-border-radius-top-left:0px;--awb-border-radius-top-right:0px;--awb-border-radius-bottom-right:0px;--awb-border-radius-bottom-left:0px;--awb-margin-top:40px;--awb-margin-bottom:40px;--awb-flex-wrap:wrap;\" ><div class=\"fusion-builder-row fusion-row fusion-flex-align-items-flex-start fusion-flex-content-wrap\" style=\"max-width:1248px;margin-left: calc(-4% \/ 2 );margin-right: calc(-4% \/ 2 );\"><div class=\"fusion-layout-column fusion_builder_column fusion-builder-column-4 fusion_builder_column_1_1 1_1 fusion-flex-column\" style=\"--awb-bg-size:cover;--awb-width-large:100%;--awb-margin-top-large:0px;--awb-spacing-right-large:1.92%;--awb-margin-bottom-large:19px;--awb-spacing-left-large:1.92%;--awb-width-medium:100%;--awb-order-medium:0;--awb-spacing-right-medium:1.92%;--awb-spacing-left-medium:1.92%;--awb-width-small:100%;--awb-order-small:0;--awb-spacing-right-small:1.92%;--awb-spacing-left-small:1.92%;\"><div class=\"fusion-column-wrapper fusion-column-has-shadow fusion-flex-justify-content-flex-start fusion-content-layout-column\"><div class=\"fusion-text fusion-text-7\"><h2><strong>THE RISK ASSESSMENT<\/strong><\/h2>\n<p>As explained above, the ConOps must be analyzed for its risk. This allows a classification of the risk and determination of appropriate safety measures. There are three options for risk assessment with increasing effort: STS, PDRA, and SORA.<\/p>\n<p>We have explained the <strong>Standard Scenarios (STS)<\/strong> required for an operational declaration in more detail <a href=\"https:\/\/www.flynex.io\/news\/three-ways-to-operational-authorisation-1-the-declaration\/\" target=\"_blank\" rel=\"noopener\">in this article<\/a>. They are predefined and describe a rather low risk, which is why a simple declaration of operation according to an STS to the authority is sufficient (only possible from 03.12.2023). Accordingly, no separate risk analysis needs to be performed here, as the risk parameters within the various scenarios are already defined.<\/p>\n<p>A continuation of the STS is the <strong>PDRA (Pre-Defined Risk Assessment)<\/strong>. As these are also predefined scenarios, they are also referred to as PDRAs (scenarios). Compared to the STS, these have a higher risk factor, which must thus be considered during operation. Due to the higher risk, a more comprehensive operating concept and risk assessment are also required here, although some steps can be skipped since these parameters are already defined in the individual PDRAs.<\/p>\n<p>If the requirements for PDRAs cannot be met, a <strong>SORA risk assessment <\/strong>must be performed (<a href=\"#SORA\">more on this below<\/a>).<\/p>\n<\/div><\/div><\/div><div class=\"fusion-layout-column fusion_builder_column fusion-builder-column-5 fusion_builder_column_1_1 1_1 fusion-flex-column\" style=\"--awb-padding-top:20px;--awb-padding-right:40px;--awb-padding-bottom:20px;--awb-padding-left:40px;--awb-bg-color:#ffffff;--awb-bg-color-hover:#ffffff;--awb-bg-size:cover;--awb-width-large:100%;--awb-margin-top-large:0px;--awb-spacing-right-large:1.92%;--awb-margin-bottom-large:19px;--awb-spacing-left-large:1.92%;--awb-width-medium:100%;--awb-order-medium:0;--awb-spacing-right-medium:1.92%;--awb-spacing-left-medium:1.92%;--awb-width-small:100%;--awb-order-small:0;--awb-spacing-right-small:1.92%;--awb-spacing-left-small:1.92%;\"><div class=\"fusion-column-wrapper fusion-column-has-shadow fusion-flex-justify-content-flex-start fusion-content-layout-column\"><div class=\"fusion-text fusion-text-8\"><h3><strong>Important<\/strong><\/h3>\n<ul class=\"keypoints\">\n<li class=\"bullets\">The <strong>STS refer exclusively to C-classified drones<\/strong>. Therefore, the application of an STS is not possible until December 2023.<\/li>\n<li class=\"bullets\">The <strong>PDRAs can also be flown with existing drones,<\/strong> i. e. not C-classified drones, and therefore already apply now.<\/li>\n<li class=\"bullets\">The STSs were established in the EU drone regulation. The PDRAs, on the other hand, were defined by EASA to shorten the effort of a full risk assessment. In the future, the LBA could also define further scenarios.<\/li>\n<\/ul>\n<p><code id=\"STS\"><\/code><\/p>\n<\/div><\/div><\/div><\/div><\/div><div class=\"fusion-fullwidth fullwidth-box fusion-builder-row-3 fusion-flex-container nonhundred-percent-fullwidth non-hundred-percent-height-scrolling\" style=\"--awb-border-radius-top-left:0px;--awb-border-radius-top-right:0px;--awb-border-radius-bottom-right:0px;--awb-border-radius-bottom-left:0px;--awb-margin-bottom:40px;--awb-flex-wrap:wrap;\" ><div class=\"fusion-builder-row fusion-row fusion-flex-align-items-flex-start fusion-flex-content-wrap\" style=\"max-width:1248px;margin-left: calc(-4% \/ 2 );margin-right: calc(-4% \/ 2 );\"><div class=\"fusion-layout-column fusion_builder_column fusion-builder-column-6 fusion_builder_column_1_1 1_1 fusion-flex-column\" style=\"--awb-bg-size:cover;--awb-width-large:100%;--awb-margin-top-large:0px;--awb-spacing-right-large:1.92%;--awb-margin-bottom-large:19px;--awb-spacing-left-large:1.92%;--awb-width-medium:100%;--awb-order-medium:0;--awb-spacing-right-medium:1.92%;--awb-spacing-left-medium:1.92%;--awb-width-small:100%;--awb-order-small:0;--awb-spacing-right-small:1.92%;--awb-spacing-left-small:1.92%;\"><div class=\"fusion-column-wrapper fusion-column-has-shadow fusion-flex-justify-content-flex-start fusion-content-layout-column\"><div class=\"fusion-text fusion-text-9\"><h3>The Standard Scenarios (STS)<\/h3>\n<p>The standard scenarios (STS) are the lowest risk predefined scenarios. If the flight project falls into one of these described categories, an operational declaration must be prepared. The declaration has to be submitted to the <span class=\"fusion-popover popover-3\" data-animation=\"1\" data-class=\"popover-3\" data-container=\"popover-3\" data-content=\"Luftfahrt-Bundesamt\" data-delay=\"50\" data-placement=\"top\" data-toggle=\"popover\" data-trigger=\"hover\">LBA<\/span>. However, this will not be possible until December 2023. A template for the declaration of operation can be found in <a href=\"https:\/\/eur-lex.europa.eu\/legal-content\/EN\/TXT\/PDF\/?uri=CELEX:32020R0639&amp;from=DE\" target=\"_blank\" rel=\"noopener\">Appendix 2 of the Commission Implementing Regulation (EU) 2020\/639.<\/a><\/p>\n<p>STS are intended to reduce the workload on agencies during permitting processes and cover most use cases. In Germany, we have currently two STS defined (according to <a href=\"https:\/\/eur-lex.europa.eu\/legal-content\/EN\/TXT\/PDF\/?uri=CELEX:32020R0639&amp;from=DE\" target=\"_blank\" rel=\"noopener\">Appendix 1 of the Commission Implementing Regulation (EU) 2020\/639<\/a>), <strong>which are expected to apply from 03.12.2023:<\/strong><\/p>\n<\/div><\/div><\/div><div class=\"fusion-layout-column fusion_builder_column fusion-builder-column-7 fusion_builder_column_1_2 1_2 fusion-flex-column\" style=\"--awb-padding-top:50px;--awb-padding-right:30px;--awb-padding-bottom:40px;--awb-padding-left:30px;--awb-bg-color:#d9d9d9;--awb-bg-color-hover:#d9d9d9;--awb-bg-size:cover;--awb-width-large:50%;--awb-margin-top-large:0px;--awb-spacing-right-large:3.84%;--awb-margin-bottom-large:19px;--awb-spacing-left-large:3.84%;--awb-width-medium:100%;--awb-order-medium:0;--awb-spacing-right-medium:1.92%;--awb-spacing-left-medium:1.92%;--awb-width-small:100%;--awb-order-small:0;--awb-spacing-right-small:1.92%;--awb-spacing-left-small:1.92%;\"><div class=\"fusion-column-wrapper fusion-column-has-shadow fusion-flex-justify-content-flex-start fusion-content-layout-column\"><div class=\"fusion-text fusion-text-10\"><h4 class=\"fusion-responsive-typography-calculated\" style=\"--fontsize: 18; line-height: 1.5; --minfontsize: 18;\" data-fontsize=\"18\" data-lineheight=\"27px\"><span style=\"color: #248ec5;\"><strong>STS-01 for C5 Drones<\/strong><\/span><\/h4>\n<ul class=\"keypoints\">\n<li class=\"bullets\"><span class=\"fusion-popover popover-4\" data-animation=\"1\" data-class=\"popover-4\" data-container=\"popover-4\" data-content=\"Visual Line of Sight\" data-delay=\"50\" data-placement=\"top\" data-toggle=\"popover\" data-trigger=\"hover\">VLOS<\/span><\/li>\n<li class=\"bullets\">Controlled ground area (flight zone, emergency zone, buffer zone)<\/li>\n<li class=\"bullets\">Remote pilot certificate required + practical training for STS1<\/li>\n<li class=\"bullets\">Airspace: controlled or uncontrolled with low risk of encountering manned aircraft.<\/li>\n<li class=\"bullets\">Maximum flight altitude: 120 m<\/li>\n<li class=\"bullets\">Maximum speed: 5 m\/s<\/li>\n<\/ul>\n<p><code id=\"PDRA\"><\/code><\/p>\n<\/div><\/div><\/div><div class=\"fusion-layout-column fusion_builder_column fusion-builder-column-8 fusion_builder_column_1_2 1_2 fusion-flex-column\" style=\"--awb-padding-top:50px;--awb-padding-right:30px;--awb-padding-bottom:73px;--awb-padding-left:30px;--awb-bg-color:#d9d9d9;--awb-bg-color-hover:#d9d9d9;--awb-bg-size:cover;--awb-width-large:50%;--awb-margin-top-large:0px;--awb-spacing-right-large:3.84%;--awb-margin-bottom-large:19px;--awb-spacing-left-large:3.84%;--awb-width-medium:100%;--awb-order-medium:0;--awb-spacing-right-medium:1.92%;--awb-spacing-left-medium:1.92%;--awb-width-small:100%;--awb-order-small:0;--awb-spacing-right-small:1.92%;--awb-spacing-left-small:1.92%;\"><div class=\"fusion-column-wrapper fusion-column-has-shadow fusion-flex-justify-content-flex-start fusion-content-layout-column\"><div class=\"fusion-text fusion-text-11\"><h4 class=\"fusion-responsive-typography-calculated\" style=\"--fontsize: 18; line-height: 1.5; --minfontsize: 18;\" data-fontsize=\"18\" data-lineheight=\"27px\"><strong><span style=\"color: #248ec5;\">STS-02 for C6 Drones<\/span><\/strong><\/h4>\n<ul class=\"keypoints\">\n<li class=\"bullets\"><span class=\"fusion-popover popover-5\" data-animation=\"1\" data-class=\"popover-5\" data-container=\"popover-5\" data-content=\"Beyond Visual Line of Sight\" data-delay=\"50\" data-placement=\"top\" data-toggle=\"popover\" data-trigger=\"hover\">BVLOS<\/span> (max. 1 km horizontal distance)<\/li>\n<li class=\"bullets\"><span class=\"fusion-popover popover-6\" data-animation=\"1\" data-class=\"popover-6\" data-container=\"popover-6\" data-content=\"Extended Visual Line of Sight\" data-delay=\"50\" data-placement=\"top\" data-toggle=\"popover\" data-trigger=\"hover\">EVLOS<\/span> (max. 2 km horizontal distance)<\/li>\n<li class=\"bullets\">Remote pilot certificate required + practical training for STS1 + STS2<\/li>\n<li class=\"bullets\">Airspace: controlled or uncontrolled with low risk of encountering manned aircraft<\/li>\n<li class=\"bullets\">Maximum flight altitude: 120 m<\/li>\n<li class=\"bullets\">Maximum speed: 50 m\/s<\/li>\n<\/ul>\n<\/div><\/div><\/div><\/div><\/div><div class=\"fusion-fullwidth fullwidth-box fusion-builder-row-4 fusion-flex-container nonhundred-percent-fullwidth non-hundred-percent-height-scrolling\" style=\"--awb-border-radius-top-left:0px;--awb-border-radius-top-right:0px;--awb-border-radius-bottom-right:0px;--awb-border-radius-bottom-left:0px;--awb-margin-bottom:40px;--awb-flex-wrap:wrap;\" ><div class=\"fusion-builder-row fusion-row fusion-flex-align-items-flex-start fusion-flex-content-wrap\" style=\"max-width:1248px;margin-left: calc(-4% \/ 2 );margin-right: calc(-4% \/ 2 );\"><div class=\"fusion-layout-column fusion_builder_column fusion-builder-column-9 fusion_builder_column_1_1 1_1 fusion-flex-column\" style=\"--awb-bg-size:cover;--awb-width-large:100%;--awb-margin-top-large:0px;--awb-spacing-right-large:1.92%;--awb-margin-bottom-large:19px;--awb-spacing-left-large:1.92%;--awb-width-medium:100%;--awb-order-medium:0;--awb-spacing-right-medium:1.92%;--awb-spacing-left-medium:1.92%;--awb-width-small:100%;--awb-order-small:0;--awb-spacing-right-small:1.92%;--awb-spacing-left-small:1.92%;\"><div class=\"fusion-column-wrapper fusion-column-has-shadow fusion-flex-justify-content-flex-start fusion-content-layout-column\"><div class=\"fusion-text fusion-text-12\"><h3>Pre-Defined Risk Assessment (PDRA)<\/h3>\n<p>The Pre-Defined Risk Assessment (shortened risk analysis) contains some risk parameters that are already predefined and are presented in different scenarios (e.g., PDRA-01). Therefore, as with the STS, the PDRAs (scenarios) are also referred to.<\/p>\n<p>They describe riskier flights, which is why a simple operational declaration is not sufficient. They serve to shorten the SORA process. If it turns out that the project falls into a PDRA after the operating concept has been prepared, some steps of the SORA can be skipped.<\/p>\n<p><span data-preserver-spaces=\"true\">The various PDRAs already contain in their definition the corresponding values for the final GRC (Ground Risk Class), the final ARC (Air Risk Class), and for SAIL (Specific Assurance and Integrity Level). These are used to determine the OSO (Operational Safety Objectives) (see\u00a0<\/span><a class=\"editor-rtfLink\" href=\"#SORA\" rel=\"noopener\"><span data-preserver-spaces=\"true\">SORA<\/span><\/a><span data-preserver-spaces=\"true\">).<\/span><\/p>\n<p><span data-preserver-spaces=\"true\">Below you will find all PDRAs defined so far with the corresponding sections of the\u00a0<\/span><a class=\"editor-rtfLink\" href=\"https:\/\/www.easa.europa.eu\/sites\/default\/files\/dfu\/Easy%20Access%20Rules%20for%20Unmanned%20Aircraft%20Systems.pdf\" target=\"_blank\" rel=\"noopener\"><span data-preserver-spaces=\"true\">Easy Access Rules for Unmanned Aircraft Systems<\/span><\/a><span data-preserver-spaces=\"true\">\u00a0(e.g., AMC2) by the EASA, where all criteria are described in detail again.<\/span>.<\/p>\n<p>Here is a link to the standard scenarios: PDRA-S01 is comparable to STS-01, and PDRA-S02 is comparable to STS-02. The main difference is that the UAS can be an existing drone or a DIY-drone, which is not the case with STS. Prerequisites for the application of standard scenarios include the operation of a C-classified drone.<\/p>\n<\/div><\/div><\/div><div class=\"fusion-layout-column fusion_builder_column fusion-builder-column-10 fusion_builder_column_1_2 1_2 fusion-flex-column fusion-column-inner-bg-wrapper fusion-column-liftup-border\" style=\"--awb-padding-top:50px;--awb-padding-right:30px;--awb-padding-bottom:60px;--awb-padding-left:30px;--awb-inner-bg-color:#d9d9d9;--awb-inner-bg-color-hover:#d9d9d9;--awb-inner-bg-size:cover;--awb-width-large:50%;--awb-margin-top-large:0px;--awb-spacing-right-large:3.84%;--awb-margin-bottom-large:19px;--awb-spacing-left-large:3.84%;--awb-width-medium:100%;--awb-order-medium:0;--awb-spacing-right-medium:1.92%;--awb-spacing-left-medium:1.92%;--awb-width-small:100%;--awb-order-small:0;--awb-spacing-right-small:1.92%;--awb-spacing-left-small:1.92%;\"><span class=\"fusion-column-inner-bg hover-type-liftup\"><span class=\"fusion-column-anchor\"><span class=\"fusion-column-inner-bg-image\"><\/span><\/span><\/span><div class=\"fusion-column-wrapper fusion-flex-justify-content-flex-start fusion-content-layout-column\"><div class=\"fusion-text fusion-text-13\"><h4><strong><span style=\"color: #248ec5;\">PDRA-S01<\/span><\/strong><\/h4>\n<ul class=\"keypoints\">\n<li class=\"bullets\">UAS with maximum dimension of up to 3 m and weight of up to 25 kg<\/li>\n<li class=\"bullets\">VLOS<\/li>\n<li class=\"bullets\">Overflight of a controlled ground area that might be located in a populated area<\/li>\n<li class=\"bullets\">Maximum height: 120 m<\/li>\n<li class=\"bullets\">Airspace: Controlled or uncontrolled, with low risk of encounter with manned aircraft<\/li>\n<li class=\"bullets\">AMC4 Article 11<\/li>\n<\/ul>\n<\/div><\/div><\/div><div class=\"fusion-layout-column fusion_builder_column fusion-builder-column-11 fusion_builder_column_1_2 1_2 fusion-flex-column fusion-column-inner-bg-wrapper fusion-column-liftup-border\" style=\"--awb-padding-top:50px;--awb-padding-right:30px;--awb-padding-bottom:20px;--awb-padding-left:30px;--awb-inner-bg-color:#d9d9d9;--awb-inner-bg-color-hover:#d9d9d9;--awb-inner-bg-size:cover;--awb-width-large:50%;--awb-margin-top-large:0px;--awb-spacing-right-large:3.84%;--awb-margin-bottom-large:19px;--awb-spacing-left-large:3.84%;--awb-width-medium:100%;--awb-order-medium:0;--awb-spacing-right-medium:1.92%;--awb-spacing-left-medium:1.92%;--awb-width-small:100%;--awb-order-small:0;--awb-spacing-right-small:1.92%;--awb-spacing-left-small:1.92%;\"><span class=\"fusion-column-inner-bg hover-type-liftup\"><span class=\"fusion-column-anchor\"><span class=\"fusion-column-inner-bg-image\"><\/span><\/span><\/span><div class=\"fusion-column-wrapper fusion-flex-justify-content-flex-start fusion-content-layout-column\"><div class=\"fusion-text fusion-text-14\"><h4><strong><span style=\"color: #248ec5;\">PDRA-S02<\/span><\/strong><\/h4>\n<ul class=\"keypoints\">\n<li class=\"bullets\">UAS with maximum dimension of up to 3 m and weight of up to 25 kg<\/li>\n<li class=\"bullets\">BVLOS (max. 1 km horizontal distance)<\/li>\n<li class=\"bullets\">EVLOS (max. 2 km horizontal distance)<\/li>\n<li class=\"bullets\">Overflight of a controlled ground area that is entirely located in a sparsely populated area<\/li>\n<li class=\"bullets\">Maximum height: 120 m<\/li>\n<li class=\"bullets\">Airspace: Controlled or uncontrolled, with low risk of encounter with manned aircraft<\/li>\n<li class=\"bullets\">AMC5 Article 11<\/li>\n<\/ul>\n<\/div><\/div><\/div><div class=\"fusion-layout-column fusion_builder_column fusion-builder-column-12 fusion_builder_column_1_2 1_2 fusion-flex-column fusion-column-inner-bg-wrapper fusion-column-liftup-border\" style=\"--awb-padding-top:50px;--awb-padding-right:30px;--awb-padding-bottom:15px;--awb-padding-left:30px;--awb-inner-bg-color:#d9d9d9;--awb-inner-bg-color-hover:#d9d9d9;--awb-inner-bg-size:cover;--awb-width-large:50%;--awb-margin-top-large:0px;--awb-spacing-right-large:3.84%;--awb-margin-bottom-large:19px;--awb-spacing-left-large:3.84%;--awb-width-medium:100%;--awb-order-medium:0;--awb-spacing-right-medium:1.92%;--awb-spacing-left-medium:1.92%;--awb-width-small:100%;--awb-order-small:0;--awb-spacing-right-small:1.92%;--awb-spacing-left-small:1.92%;\"><span class=\"fusion-column-inner-bg hover-type-liftup\"><span class=\"fusion-column-anchor\"><span class=\"fusion-column-inner-bg-image\"><\/span><\/span><\/span><div class=\"fusion-column-wrapper fusion-flex-justify-content-flex-start fusion-content-layout-column\"><div class=\"fusion-text fusion-text-15\"><h4><strong><span style=\"color: #248ec5;\">PDRA-G01<\/span><\/strong><\/h4>\n<ul class=\"keypoints\">\n<li class=\"bullets\">UAS with maximum dimension of up to 3 m and typical kinetic energy of up to 34 kJ<\/li>\n<li class=\"bullets\">BVLOS (max. 1 km distance)<\/li>\n<li class=\"bullets\">EVLOS (range not limited, but max. 1 km distance between the airspace observer)<\/li>\n<li class=\"bullets\">Overflight of a sparsely populated area<\/li>\n<li class=\"bullets\">Maximal height: 150 m (operational volume)<\/li>\n<li class=\"bullets\">Airspace: Uncontrolled, with low risk of encounter with manned aircraft<\/li>\n<li class=\"bullets\">AMC2 Article 11<\/li>\n<\/ul>\n<p><code id=\"SORA\"><\/code><\/p>\n<\/div><\/div><\/div><div class=\"fusion-layout-column fusion_builder_column fusion-builder-column-13 fusion_builder_column_1_2 1_2 fusion-flex-column fusion-column-inner-bg-wrapper fusion-column-liftup-border\" style=\"--awb-padding-top:50px;--awb-padding-right:30px;--awb-padding-bottom:117px;--awb-padding-left:30px;--awb-inner-bg-color:#d9d9d9;--awb-inner-bg-color-hover:#d9d9d9;--awb-inner-bg-size:cover;--awb-width-large:50%;--awb-margin-top-large:0px;--awb-spacing-right-large:3.84%;--awb-margin-bottom-large:19px;--awb-spacing-left-large:3.84%;--awb-width-medium:100%;--awb-order-medium:0;--awb-spacing-right-medium:1.92%;--awb-spacing-left-medium:1.92%;--awb-width-small:100%;--awb-order-small:0;--awb-spacing-right-small:1.92%;--awb-spacing-left-small:1.92%;\"><span class=\"fusion-column-inner-bg hover-type-liftup\"><span class=\"fusion-column-anchor\"><span class=\"fusion-column-inner-bg-image\"><\/span><\/span><\/span><div class=\"fusion-column-wrapper fusion-flex-justify-content-flex-start fusion-content-layout-column\"><div class=\"fusion-text fusion-text-16\"><h4><strong><span style=\"color: #248ec5;\">PDRA-G02<\/span><\/strong><\/h4>\n<ul class=\"keypoints\">\n<li class=\"bullets\">UAS with maximum dimension of up to 3 m and typical kinetic energy of up to 34 kJ<\/li>\n<li class=\"bullets\">BVLOS<\/li>\n<li class=\"bullets\">Overflight of a sparsely populated area<\/li>\n<li class=\"bullets\">Maximal height: as established for the reserved airspace<\/li>\n<li class=\"bullets\">Airspace: as reserved for the operation<\/li>\n<li class=\"bullets\">AMC3 Article 11<\/li>\n<\/ul>\n<\/div><\/div><\/div><\/div><\/div><div class=\"fusion-fullwidth fullwidth-box fusion-builder-row-5 fusion-flex-container nonhundred-percent-fullwidth non-hundred-percent-height-scrolling\" style=\"--awb-border-radius-top-left:0px;--awb-border-radius-top-right:0px;--awb-border-radius-bottom-right:0px;--awb-border-radius-bottom-left:0px;--awb-margin-bottom:20px;--awb-flex-wrap:wrap;\" ><div class=\"fusion-builder-row fusion-row fusion-flex-align-items-flex-start fusion-flex-content-wrap\" style=\"max-width:1248px;margin-left: calc(-4% \/ 2 );margin-right: calc(-4% \/ 2 );\"><div class=\"fusion-layout-column fusion_builder_column fusion-builder-column-14 fusion_builder_column_3_4 3_4 fusion-flex-column\" style=\"--awb-bg-size:cover;--awb-width-large:75%;--awb-margin-top-large:0px;--awb-spacing-right-large:2.56%;--awb-margin-bottom-large:19px;--awb-spacing-left-large:2.56%;--awb-width-medium:100%;--awb-order-medium:0;--awb-spacing-right-medium:1.92%;--awb-spacing-left-medium:1.92%;--awb-width-small:100%;--awb-order-small:0;--awb-spacing-right-small:1.92%;--awb-spacing-left-small:1.92%;\"><div class=\"fusion-column-wrapper fusion-column-has-shadow fusion-flex-justify-content-flex-start fusion-content-layout-column\"><div class=\"fusion-text fusion-text-17\"><h3>Specific Operational Risk Assessment (SORA)<\/h3>\n<p>The EASA-SORA process is described in <a href=\"https:\/\/eur-lex.europa.eu\/legal-content\/EN\/TXT\/PDF\/?uri=CELEX:32019R0947&amp;from=DE\" target=\"_blank\" rel=\"noopener\">Article 11 of the Commission Implementing Regulation 2019\/947<\/a> and named a suitable, Europe-wide recognized means for risk assessment. Accordingly, the former national SORA-GER is no longer valid.<\/p>\n<p>On the right, you will find the entire process of a SORA illustrated. Below, the individual steps are explained again in detail.<\/p>\n<\/div><div class=\"fusion-text fusion-text-18\"><p><strong><span data-preserver-spaces=\"true\">Important<\/span><\/strong><span data-preserver-spaces=\"true\">: The principle of robustness runs through the entire SORA concept and is therefore essential to understand. What is meant by this is that any risk reduction or operational safety objective can be demonstrated at different levels of robustness. The SORA process proposes three different levels of robustness: low, medium, and high. The robustness rating is based on both the\u00a0<\/span><strong><span data-preserver-spaces=\"true\">level of integrity<\/span><\/strong><span data-preserver-spaces=\"true\">\u00a0(the safety gain) and the\u00a0<\/span><strong><span data-preserver-spaces=\"true\">level of certainty<\/span><\/strong><span data-preserver-spaces=\"true\">\u00a0that the claimed safety gain has been achieved. A high level of robustness should therefore be aimed for.<\/span><\/p>\n<\/div><\/div><\/div><div class=\"fusion-layout-column fusion_builder_column fusion-builder-column-15 fusion_builder_column_1_4 1_4 fusion-flex-column fusion-flex-align-self-center\" style=\"--awb-bg-size:cover;--awb-width-large:25%;--awb-margin-top-large:0px;--awb-spacing-right-large:7.68%;--awb-margin-bottom-large:19px;--awb-spacing-left-large:7.68%;--awb-width-medium:100%;--awb-order-medium:0;--awb-spacing-right-medium:1.92%;--awb-spacing-left-medium:1.92%;--awb-width-small:100%;--awb-order-small:0;--awb-spacing-right-small:1.92%;--awb-spacing-left-small:1.92%;\"><div class=\"fusion-column-wrapper fusion-column-has-shadow fusion-flex-justify-content-space-evenly fusion-content-layout-column\"><div class=\"fusion-image-element \" style=\"--awb-margin-top:20px;--awb-margin-bottom:20px;--awb-caption-title-font-family:var(--h2_typography-font-family);--awb-caption-title-font-weight:var(--h2_typography-font-weight);--awb-caption-title-font-style:var(--h2_typography-font-style);--awb-caption-title-size:var(--h2_typography-font-size);--awb-caption-title-transform:var(--h2_typography-text-transform);--awb-caption-title-line-height:var(--h2_typography-line-height);--awb-caption-title-letter-spacing:var(--h2_typography-letter-spacing);\"><span class=\" fusion-imageframe imageframe-none imageframe-2 hover-type-none\"><a href=\"https:\/\/www.flynex.io\/wp-content\/uploads\/2021\/07\/SORA-Prozess-ENG-1200x2033.jpg\" class=\"fusion-lightbox\" data-rel=\"iLightbox[738d85993aa7b51c119]\" data-title=\"The SORA Process\" title=\"SORA-Prozess-ENG\"><img decoding=\"async\" width=\"400\" height=\"678\" alt=\"Der SORA Prozess\" src=\"https:\/\/www.flynex.io\/wp-content\/uploads\/2021\/07\/SORA-Prozess-ENG.png\" data-orig-src=\"https:\/\/www.flynex.io\/wp-content\/uploads\/2021\/07\/SORA-Prozess-ENG-400x678.png\" class=\"lazyload img-responsive wp-image-17150\" srcset=\"data:image\/svg+xml,%3Csvg%20xmlns%3D%27http%3A%2F%2Fwww.w3.org%2F2000%2Fsvg%27%20width%3D%271246%27%20height%3D%272111%27%20viewBox%3D%270%200%201246%202111%27%3E%3Crect%20width%3D%271246%27%20height%3D%272111%27%20fill-opacity%3D%220%22%2F%3E%3C%2Fsvg%3E\" data-srcset=\"https:\/\/www.flynex.io\/wp-content\/uploads\/2021\/07\/SORA-Prozess-ENG-200x339.png 200w, https:\/\/www.flynex.io\/wp-content\/uploads\/2021\/07\/SORA-Prozess-ENG-400x678.png 400w, https:\/\/www.flynex.io\/wp-content\/uploads\/2021\/07\/SORA-Prozess-ENG-600x1017.png 600w, https:\/\/www.flynex.io\/wp-content\/uploads\/2021\/07\/SORA-Prozess-ENG-800x1355.png 800w, https:\/\/www.flynex.io\/wp-content\/uploads\/2021\/07\/SORA-Prozess-ENG-1200x2033.png 1200w, https:\/\/www.flynex.io\/wp-content\/uploads\/2021\/07\/SORA-Prozess-ENG.png 1246w\" data-sizes=\"auto\" data-orig-sizes=\"(max-width: 1024px) 100vw, (max-width: 643px) 100vw, 400px\" \/><\/a><\/span><\/div><\/div><\/div><div class=\"fusion-layout-column fusion_builder_column fusion-builder-column-16 fusion_builder_column_1_1 1_1 fusion-flex-column\" style=\"--awb-bg-size:cover;--awb-width-large:100%;--awb-margin-top-large:0px;--awb-spacing-right-large:1.92%;--awb-margin-bottom-large:19px;--awb-spacing-left-large:1.92%;--awb-width-medium:100%;--awb-order-medium:0;--awb-spacing-right-medium:1.92%;--awb-spacing-left-medium:1.92%;--awb-width-small:100%;--awb-order-small:0;--awb-spacing-right-small:1.92%;--awb-spacing-left-small:1.92%;\"><div class=\"fusion-column-wrapper fusion-column-has-shadow fusion-flex-justify-content-flex-start fusion-content-layout-column\"><div class=\"accordian fusion-accordian\" style=\"--awb-border-size:1px;--awb-icon-size:16px;--awb-content-font-size:18px;--awb-icon-alignment:left;--awb-hover-color:#f9f9f9;--awb-border-color:#cccccc;--awb-background-color:#ffffff;--awb-divider-color:#e0dede;--awb-divider-hover-color:#e0dede;--awb-icon-color:#ffffff;--awb-title-color:var(--awb-custom16);--awb-content-color:#404040;--awb-icon-box-color:#333333;--awb-toggle-hover-accent-color:#9e9e9e;--awb-title-font-family:&quot;Source Sans Pro&quot;;--awb-title-font-weight:700;--awb-title-font-style:normal;--awb-title-font-size:18px;--awb-content-font-family:&quot;Source Sans Pro&quot;;--awb-content-font-style:normal;--awb-content-font-weight:300;\"><div class=\"panel-group fusion-toggle-icon-boxed\" id=\"accordion-17143-2\"><div class=\"fusion-panel panel-default panel-8e490f86a671f405c fusion-toggle-no-divider fusion-toggle-boxed-mode\"><div class=\"panel-heading\"><h4 class=\"panel-title toggle\" id=\"toggle_8e490f86a671f405c\"><a aria-expanded=\"false\" aria-controls=\"8e490f86a671f405c\" role=\"button\" data-toggle=\"collapse\" data-target=\"#8e490f86a671f405c\" href=\"#8e490f86a671f405c\"><span class=\"fusion-toggle-icon-wrapper\" aria-hidden=\"true\"><i class=\"fa-fusion-box active-icon awb-icon-minus\" aria-hidden=\"true\"><\/i><i class=\"fa-fusion-box inactive-icon awb-icon-plus\" aria-hidden=\"true\"><\/i><\/span><span class=\"fusion-toggle-heading\">1. Description of the ConOps <\/span><\/a><\/h4><\/div><div id=\"8e490f86a671f405c\" class=\"panel-collapse collapse \" aria-labelledby=\"toggle_8e490f86a671f405c\"><div class=\"panel-body toggle-content fusion-clearfix\">\n<p>The basis of all risk assessments is a concept of operations. It must be prepared at the beginning and further elaborated during the SORA process so that a complete and fully comprehensive document is produced at the end.<\/p>\n<\/div><\/div><\/div><div class=\"fusion-panel panel-default panel-9653b3bd7b9d91c16 fusion-toggle-no-divider fusion-toggle-boxed-mode\"><div class=\"panel-heading\"><h4 class=\"panel-title toggle\" id=\"toggle_9653b3bd7b9d91c16\"><a aria-expanded=\"false\" aria-controls=\"9653b3bd7b9d91c16\" role=\"button\" data-toggle=\"collapse\" data-target=\"#9653b3bd7b9d91c16\" href=\"#9653b3bd7b9d91c16\"><span class=\"fusion-toggle-icon-wrapper\" aria-hidden=\"true\"><i class=\"fa-fusion-box active-icon awb-icon-minus\" aria-hidden=\"true\"><\/i><i class=\"fa-fusion-box inactive-icon awb-icon-plus\" aria-hidden=\"true\"><\/i><\/span><span class=\"fusion-toggle-heading\">2. Determination of the Ground Risk Class (GRC)<\/span><\/a><\/h4><\/div><div id=\"9653b3bd7b9d91c16\" class=\"panel-collapse collapse \" aria-labelledby=\"toggle_9653b3bd7b9d91c16\"><div class=\"panel-body toggle-content fusion-clearfix\">\n<p>The GRC (ground risk) refers to the risk of a person being hit by the UAS (in the event of a loss of control of the UAV).<\/p>\n<\/div><\/div><\/div><div class=\"fusion-panel panel-default panel-5ce98ca287c6e1152 fusion-toggle-no-divider fusion-toggle-boxed-mode\"><div class=\"panel-heading\"><h4 class=\"panel-title toggle\" id=\"toggle_5ce98ca287c6e1152\"><a aria-expanded=\"false\" aria-controls=\"5ce98ca287c6e1152\" role=\"button\" data-toggle=\"collapse\" data-target=\"#5ce98ca287c6e1152\" href=\"#5ce98ca287c6e1152\"><span class=\"fusion-toggle-icon-wrapper\" aria-hidden=\"true\"><i class=\"fa-fusion-box active-icon awb-icon-minus\" aria-hidden=\"true\"><\/i><i class=\"fa-fusion-box inactive-icon awb-icon-plus\" aria-hidden=\"true\"><\/i><\/span><span class=\"fusion-toggle-heading\">3. Final GRC determination<\/span><\/a><\/h4><\/div><div id=\"5ce98ca287c6e1152\" class=\"panel-collapse collapse \" aria-labelledby=\"toggle_5ce98ca287c6e1152\"><div class=\"panel-body toggle-content fusion-clearfix\">\n<p>The ground risk can be reduced by mitigation measures, i.e., risk reduction measures. A correction factor is determined that indicates the extent to which the risk reductions are available to the operation and the extent to which the GRC can thus be improved. The GRC is then offset against the correction factor, resulting in the Final GRC.<\/p>\n<\/div><\/div><\/div><div class=\"fusion-panel panel-default panel-99db180acfcb61c02 fusion-toggle-no-divider fusion-toggle-boxed-mode\"><div class=\"panel-heading\"><h4 class=\"panel-title toggle\" id=\"toggle_99db180acfcb61c02\"><a aria-expanded=\"false\" aria-controls=\"99db180acfcb61c02\" role=\"button\" data-toggle=\"collapse\" data-target=\"#99db180acfcb61c02\" href=\"#99db180acfcb61c02\"><span class=\"fusion-toggle-icon-wrapper\" aria-hidden=\"true\"><i class=\"fa-fusion-box active-icon awb-icon-minus\" aria-hidden=\"true\"><\/i><i class=\"fa-fusion-box inactive-icon awb-icon-plus\" aria-hidden=\"true\"><\/i><\/span><span class=\"fusion-toggle-heading\">4. Determination of the Air Risk Class (ARC)<\/span><\/a><\/h4><\/div><div id=\"99db180acfcb61c02\" class=\"panel-collapse collapse \" aria-labelledby=\"toggle_99db180acfcb61c02\"><div class=\"panel-body toggle-content fusion-clearfix\">\n<p>The ARC provides information on the risk of collision with other flying objects in the air. Airspace is divided into 13 collision risk categories based on the factors: Altitude of airspace, controlled or uncontrolled airspace, airport or non-airport, urban or rural airspace, and atypical (e.g., separated) or typical airspace. This then results in ARC classes ARC-a, ARC-b, ARC-c, ARC-d. Only ARC-a is considered an acceptable risk class and requires no further mitigation measures.<\/p>\n<\/div><\/div><\/div><div class=\"fusion-panel panel-default panel-c32a62c0804311138 fusion-toggle-no-divider fusion-toggle-boxed-mode\"><div class=\"panel-heading\"><h4 class=\"panel-title toggle\" id=\"toggle_c32a62c0804311138\"><a aria-expanded=\"false\" aria-controls=\"c32a62c0804311138\" role=\"button\" data-toggle=\"collapse\" data-target=\"#c32a62c0804311138\" href=\"#c32a62c0804311138\"><span class=\"fusion-toggle-icon-wrapper\" aria-hidden=\"true\"><i class=\"fa-fusion-box active-icon awb-icon-minus\" aria-hidden=\"true\"><\/i><i class=\"fa-fusion-box inactive-icon awb-icon-plus\" aria-hidden=\"true\"><\/i><\/span><span class=\"fusion-toggle-heading\">5. Final ARC determination<\/span><\/a><\/h4><\/div><div id=\"c32a62c0804311138\" class=\"panel-collapse collapse \" aria-labelledby=\"toggle_c32a62c0804311138\"><div class=\"panel-body toggle-content fusion-clearfix\">\n<p>This step is optional and only needs to be performed if the applicant estimates that the ARC can be improved with ARC risk mitigation measures in the preceding step. In that case, respective measures can be described in this step, and thus a better classification can be made. This is the Final ARC. If the applicant does not wish to take this step, the ARC from step 4 is automatically the Final ARC.<\/p>\n<\/div><\/div><\/div><div class=\"fusion-panel panel-default panel-fe50169da1aab338f fusion-toggle-no-divider fusion-toggle-boxed-mode\"><div class=\"panel-heading\"><h4 class=\"panel-title toggle\" id=\"toggle_fe50169da1aab338f\"><a aria-expanded=\"false\" aria-controls=\"fe50169da1aab338f\" role=\"button\" data-toggle=\"collapse\" data-target=\"#fe50169da1aab338f\" href=\"#fe50169da1aab338f\"><span class=\"fusion-toggle-icon-wrapper\" aria-hidden=\"true\"><i class=\"fa-fusion-box active-icon awb-icon-minus\" aria-hidden=\"true\"><\/i><i class=\"fa-fusion-box inactive-icon awb-icon-plus\" aria-hidden=\"true\"><\/i><\/span><span class=\"fusion-toggle-heading\">6. TMPR and robustness levels<\/span><\/a><\/h4><\/div><div id=\"fe50169da1aab338f\" class=\"panel-collapse collapse \" aria-labelledby=\"toggle_fe50169da1aab338f\"><div class=\"panel-body toggle-content fusion-clearfix\">\n<p>TMPR stands for Tactical Mitigation Performance Requirement and means tactical risk mitigation requirement. These depend on the respective ARC value. A distinction is made between VLOS\/EVLOS and BVLOS flights, whereby VLOS\/EVLOS flights do not require a TMPR value and robustness level. They are already considered acceptable tactical mitigation of collision risk for all ARC levels.<\/p>\n<p>For BVLOS flights, the following overview applies:<\/p>\n<p><img decoding=\"async\" class=\"lazyload alignnone size-fusion-600 wp-image-17171\" src=\"https:\/\/www.flynex.io\/wp-content\/uploads\/2021\/07\/TMPR-Table-600x142.png\" data-orig-src=\"https:\/\/www.flynex.io\/wp-content\/uploads\/2021\/07\/TMPR-Table-600x142.png\" alt=\"TMPR and robustness levels\" width=\"600\" height=\"142\" srcset=\"data:image\/svg+xml,%3Csvg%20xmlns%3D%27http%3A%2F%2Fwww.w3.org%2F2000%2Fsvg%27%20width%3D%27600%27%20height%3D%27142%27%20viewBox%3D%270%200%20600%20142%27%3E%3Crect%20width%3D%27600%27%20height%3D%27142%27%20fill-opacity%3D%220%22%2F%3E%3C%2Fsvg%3E\" data-srcset=\"https:\/\/www.flynex.io\/wp-content\/uploads\/2021\/07\/TMPR-Table-200x47.png 200w, https:\/\/www.flynex.io\/wp-content\/uploads\/2021\/07\/TMPR-Table-300x71.png 300w, https:\/\/www.flynex.io\/wp-content\/uploads\/2021\/07\/TMPR-Table-400x95.png 400w, https:\/\/www.flynex.io\/wp-content\/uploads\/2021\/07\/TMPR-Table-600x142.png 600w, https:\/\/www.flynex.io\/wp-content\/uploads\/2021\/07\/TMPR-Table-768x182.png 768w, https:\/\/www.flynex.io\/wp-content\/uploads\/2021\/07\/TMPR-Table-800x190.png 800w, https:\/\/www.flynex.io\/wp-content\/uploads\/2021\/07\/TMPR-Table-1024x243.png 1024w, https:\/\/www.flynex.io\/wp-content\/uploads\/2021\/07\/TMPR-Table-1200x285.png 1200w, https:\/\/www.flynex.io\/wp-content\/uploads\/2021\/07\/TMPR-Table-1536x365.png 1536w\" data-sizes=\"auto\" data-orig-sizes=\"(max-width: 600px) 100vw, 600px\" \/><\/p>\n<\/div><\/div><\/div><div class=\"fusion-panel panel-default panel-6e5d63fa892598bdf fusion-toggle-no-divider fusion-toggle-boxed-mode\"><div class=\"panel-heading\"><h4 class=\"panel-title toggle\" id=\"toggle_6e5d63fa892598bdf\"><a aria-expanded=\"false\" aria-controls=\"6e5d63fa892598bdf\" role=\"button\" data-toggle=\"collapse\" data-target=\"#6e5d63fa892598bdf\" href=\"#6e5d63fa892598bdf\"><span class=\"fusion-toggle-icon-wrapper\" aria-hidden=\"true\"><i class=\"fa-fusion-box active-icon awb-icon-minus\" aria-hidden=\"true\"><\/i><i class=\"fa-fusion-box inactive-icon awb-icon-plus\" aria-hidden=\"true\"><\/i><\/span><span class=\"fusion-toggle-heading\">7. Determination of SAIL (Specific Assurance and Integrity Level)<\/span><\/a><\/h4><\/div><div id=\"6e5d63fa892598bdf\" class=\"panel-collapse collapse \" aria-labelledby=\"toggle_6e5d63fa892598bdf\"><div class=\"panel-body toggle-content fusion-clearfix\">\n<p>SAIL combines the ground and air risk analyses (Final GRC and Final ARC) and determines the actions required as a result. SAIL indicates the level of reliability with which UAS operations remain under control.<\/p>\n<\/div><\/div><\/div><div class=\"fusion-panel panel-default panel-37b596289113dcde1 fusion-toggle-no-divider fusion-toggle-boxed-mode\"><div class=\"panel-heading\"><h4 class=\"panel-title toggle\" id=\"toggle_37b596289113dcde1\"><a aria-expanded=\"false\" aria-controls=\"37b596289113dcde1\" role=\"button\" data-toggle=\"collapse\" data-target=\"#37b596289113dcde1\" href=\"#37b596289113dcde1\"><span class=\"fusion-toggle-icon-wrapper\" aria-hidden=\"true\"><i class=\"fa-fusion-box active-icon awb-icon-minus\" aria-hidden=\"true\"><\/i><i class=\"fa-fusion-box inactive-icon awb-icon-plus\" aria-hidden=\"true\"><\/i><\/span><span class=\"fusion-toggle-heading\">8. Identification of OSOs (Operational Safety Objectives)<\/span><\/a><\/h4><\/div><div id=\"37b596289113dcde1\" class=\"panel-collapse collapse \" aria-labelledby=\"toggle_37b596289113dcde1\"><div class=\"panel-body toggle-content fusion-clearfix\">\n<p>The SAIL value provides information about the required robustness level of the OSOs. OSO stands for Operational Safety Objective and defines various of them. For example, OSO#4 defines: &#8220;UAS developed according to recognised design standards&#8221;. The SAIL value would now provide information on the extent to which the specification is to be met.<\/p>\n<p><img decoding=\"async\" class=\"lazyload size-fusion-600 wp-image-17173 aligncenter\" src=\"https:\/\/www.flynex.io\/wp-content\/uploads\/2021\/07\/Example-OSO-4-600x111.png\" data-orig-src=\"https:\/\/www.flynex.io\/wp-content\/uploads\/2021\/07\/Example-OSO-4-600x111.png\" alt=\"Example OSO #4\" width=\"600\" height=\"111\" srcset=\"data:image\/svg+xml,%3Csvg%20xmlns%3D%27http%3A%2F%2Fwww.w3.org%2F2000%2Fsvg%27%20width%3D%27600%27%20height%3D%27111%27%20viewBox%3D%270%200%20600%20111%27%3E%3Crect%20width%3D%27600%27%20height%3D%27111%27%20fill-opacity%3D%220%22%2F%3E%3C%2Fsvg%3E\" data-srcset=\"https:\/\/www.flynex.io\/wp-content\/uploads\/2021\/07\/Example-OSO-4-200x37.png 200w, https:\/\/www.flynex.io\/wp-content\/uploads\/2021\/07\/Example-OSO-4-300x55.png 300w, https:\/\/www.flynex.io\/wp-content\/uploads\/2021\/07\/Example-OSO-4-400x74.png 400w, https:\/\/www.flynex.io\/wp-content\/uploads\/2021\/07\/Example-OSO-4-600x111.png 600w, https:\/\/www.flynex.io\/wp-content\/uploads\/2021\/07\/Example-OSO-4-768x142.png 768w, https:\/\/www.flynex.io\/wp-content\/uploads\/2021\/07\/Example-OSO-4-800x147.png 800w, https:\/\/www.flynex.io\/wp-content\/uploads\/2021\/07\/Example-OSO-4-1024x189.png 1024w, https:\/\/www.flynex.io\/wp-content\/uploads\/2021\/07\/Example-OSO-4-1200x221.png 1200w, https:\/\/www.flynex.io\/wp-content\/uploads\/2021\/07\/Example-OSO-4-1536x283.png 1536w\" data-sizes=\"auto\" data-orig-sizes=\"(max-width: 600px) 100vw, 600px\" \/><\/p>\n<p style=\"text-align: center;\"><em>O = \u201eOptional\u201c; L = Low robustness; M = Medium robustness; H = High robustness<\/em><\/p>\n<\/div><\/div><\/div><div class=\"fusion-panel panel-default panel-fbec38d254ad895b0 fusion-toggle-no-divider fusion-toggle-boxed-mode\"><div class=\"panel-heading\"><h4 class=\"panel-title toggle\" id=\"toggle_fbec38d254ad895b0\"><a aria-expanded=\"false\" aria-controls=\"fbec38d254ad895b0\" role=\"button\" data-toggle=\"collapse\" data-target=\"#fbec38d254ad895b0\" href=\"#fbec38d254ad895b0\"><span class=\"fusion-toggle-icon-wrapper\" aria-hidden=\"true\"><i class=\"fa-fusion-box active-icon awb-icon-minus\" aria-hidden=\"true\"><\/i><i class=\"fa-fusion-box inactive-icon awb-icon-plus\" aria-hidden=\"true\"><\/i><\/span><span class=\"fusion-toggle-heading\">9. Adjacent area \/ airspace considerations<\/span><\/a><\/h4><\/div><div id=\"fbec38d254ad895b0\" class=\"panel-collapse collapse \" aria-labelledby=\"toggle_fbec38d254ad895b0\"><div class=\"panel-body toggle-content fusion-clearfix\">\n<p>This is about considering the risk of loss of control for the air and ground space. Depending on the flight and flight phase, safety requirements are again imposed here. Since it is not possible to foresee all local conditions, UAS operators should show sound judgment to the competent authority in defining &#8220;adjacent airspace&#8221; and &#8220;adjacent areas&#8221;.<\/p>\n<\/div><\/div><\/div><div class=\"fusion-panel panel-default panel-f477d3e87bf1838ec fusion-toggle-no-divider fusion-toggle-boxed-mode\"><div class=\"panel-heading\"><h4 class=\"panel-title toggle\" id=\"toggle_f477d3e87bf1838ec\"><a aria-expanded=\"false\" aria-controls=\"f477d3e87bf1838ec\" role=\"button\" data-toggle=\"collapse\" data-target=\"#f477d3e87bf1838ec\" href=\"#f477d3e87bf1838ec\"><span class=\"fusion-toggle-icon-wrapper\" aria-hidden=\"true\"><i class=\"fa-fusion-box active-icon awb-icon-minus\" aria-hidden=\"true\"><\/i><i class=\"fa-fusion-box inactive-icon awb-icon-plus\" aria-hidden=\"true\"><\/i><\/span><span class=\"fusion-toggle-heading\">10. Comprehensive Safety Portfolio<\/span><\/a><\/h4><\/div><div id=\"f477d3e87bf1838ec\" class=\"panel-collapse collapse \" aria-labelledby=\"toggle_f477d3e87bf1838ec\"><div class=\"panel-body toggle-content fusion-clearfix\">\n<p>The UAS operator should ensure that any additional requirements not identified in the SORA process (e.g., environmental protection) are addressed in this step. Relevant stakeholders should also be identified here. These include, for example, environmental protection agencies, national security agencies, etc.<\/p>\n<\/div><\/div><\/div><\/div><\/div><\/div><\/div><\/div><\/div><div class=\"fusion-fullwidth fullwidth-box fusion-builder-row-6 fusion-flex-container nonhundred-percent-fullwidth non-hundred-percent-height-scrolling\" style=\"--awb-border-radius-top-left:0px;--awb-border-radius-top-right:0px;--awb-border-radius-bottom-right:0px;--awb-border-radius-bottom-left:0px;--awb-flex-wrap:wrap;\" ><div class=\"fusion-builder-row fusion-row fusion-flex-align-items-flex-start fusion-flex-content-wrap\" style=\"max-width:1248px;margin-left: calc(-4% \/ 2 );margin-right: calc(-4% \/ 2 );\"><div class=\"fusion-layout-column fusion_builder_column fusion-builder-column-17 fusion_builder_column_1_1 1_1 fusion-flex-column\" style=\"--awb-bg-size:cover;--awb-width-large:100%;--awb-margin-top-large:0px;--awb-spacing-right-large:1.92%;--awb-margin-bottom-large:19px;--awb-spacing-left-large:1.92%;--awb-width-medium:100%;--awb-order-medium:0;--awb-spacing-right-medium:1.92%;--awb-spacing-left-medium:1.92%;--awb-width-small:100%;--awb-order-small:0;--awb-spacing-right-small:1.92%;--awb-spacing-left-small:1.92%;\"><div class=\"fusion-column-wrapper fusion-column-has-shadow fusion-flex-justify-content-flex-start fusion-content-layout-column\"><div class=\"fusion-separator fusion-full-width-sep\" style=\"align-self: center;margin-left: auto;margin-right: auto;margin-bottom:50px;width:100%;\"><div class=\"fusion-separator-border sep-shadow\" style=\"--awb-height:20px;--awb-amount:20px;background:radial-gradient(ellipse at 50% -50% , #e0dede 0px, rgba(255, 255, 255, 0) 80%) repeat scroll 0 0 rgba(0, 0, 0, 0);background:-webkit-radial-gradient(ellipse at 50% -50% , #e0dede 0px, rgba(255, 255, 255, 0) 80%) repeat scroll 0 0 rgba(0, 0, 0, 0);background:-moz-radial-gradient(ellipse at 50% -50% , #e0dede 0px, rgba(255, 255, 255, 0) 80%) repeat scroll 0 0 rgba(0, 0, 0, 0);background:-o-radial-gradient(ellipse at 50% -50% , #e0dede 0px, rgba(255, 255, 255, 0) 80%) repeat scroll 0 0 rgba(0, 0, 0, 0);\"><\/div><\/div><div class=\"fusion-text fusion-text-19\"><p>The time-consuming process of obtaining approval should not deter you from your project. Once the document is created, it only needs to be updated in case of fundamental changes. A permit can thus be issued for repetitive flights.<\/p>\n<p>Do you need help applying for an operating permit? We will be happy to assist you and do the work for you. <a href=\"https:\/\/www.flynex.io\/permission-service\/\" target=\"_blank\" rel=\"noopener\">Click here for our permission service<\/a>.<\/p>\n<p>We wish you safe flights,<\/p>\n<p>Your FlyNex Team<\/p>\n<\/div><\/div><\/div><\/div><\/div><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Anyone planning a high-risk flight requiring a permit that deviates from the predefined standard scenarios must submit an operating permit. In this article, we highlight the approval process, including the operational concept and risk assessment according to SORA. <\/p>\n","protected":false},"author":1357,"featured_media":16364,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[16],"tags":[1017,996,982,812,999,998,995,255,976,997,390,978,979,458],"class_list":["post-17143","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-authorization","tag-concept-of-operation","tag-conop-2","tag-lba-2","tag-operational-authorisation","tag-operational-permission","tag-pdra","tag-permission-service","tag-permit","tag-risk-assessment","tag-sora-en","tag-standard-scenario","tag-sts-2","tag-uas-2"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.1.1 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>How do I get permission for my drone flight? - Everything about SORA &amp; Co.<\/title>\n<meta name=\"description\" content=\"Anyone planning a high-risk flight must apply for operational authorization. Read more about how this works and what SORA, PDRA, and STS are all about in this article.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.flynex.io\/en\/news\/three-ways-to-flight-authorization-2-the-operational-permit\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"How do I get permission for my drone flight? - Everything about SORA &amp; Co.\" \/>\n<meta property=\"og:description\" content=\"Anyone planning a high-risk flight must apply for operational authorization. Read more about how this works and what SORA, PDRA, and STS are all about in this article.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.flynex.io\/en\/news\/three-ways-to-flight-authorization-2-the-operational-permit\/\" \/>\n<meta property=\"og:site_name\" content=\"FlyNex\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/flynex.io\/\" \/>\n<meta property=\"article:published_time\" content=\"2021-07-14T14:51:12+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2021-07-27T08:56:25+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.flynex.io\/wp-content\/uploads\/2021\/06\/2021-06-Aufstiegsgenehmigungen.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"800\" \/>\n\t<meta property=\"og:image:height\" content=\"450\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Sebastian Hack\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@FlyNex_io\" \/>\n<meta name=\"twitter:site\" content=\"@FlyNex_io\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Sebastian Hack\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"28 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.flynex.io\/en\/news\/three-ways-to-flight-authorization-2-the-operational-permit\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.flynex.io\/en\/news\/three-ways-to-flight-authorization-2-the-operational-permit\/\"},\"author\":{\"name\":\"Sebastian Hack\",\"@id\":\"https:\/\/live-new03.flynex.io\/en\/#\/schema\/person\/4c1b16dc9ca091a761363ced757da047\"},\"headline\":\"Three Ways to Flight Authorization: 2. The Operational Permit\",\"datePublished\":\"2021-07-14T14:51:12+00:00\",\"dateModified\":\"2021-07-27T08:56:25+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.flynex.io\/en\/news\/three-ways-to-flight-authorization-2-the-operational-permit\/\"},\"wordCount\":11193,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/live-new03.flynex.io\/en\/#organization\"},\"image\":{\"@id\":\"https:\/\/www.flynex.io\/en\/news\/three-ways-to-flight-authorization-2-the-operational-permit\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.flynex.io\/wp-content\/uploads\/2021\/06\/2021-06-Aufstiegsgenehmigungen.jpg\",\"keywords\":[\"Authorization\",\"Concept of Operation\",\"ConOp\",\"LBA\",\"Operational Authorisation\",\"Operational Permission\",\"PDRA\",\"permission service\",\"Permit\",\"Risk Assessment\",\"SORA\",\"Standard scenario\",\"STS\",\"UAS\"],\"articleSection\":[\"News\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.flynex.io\/en\/news\/three-ways-to-flight-authorization-2-the-operational-permit\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.flynex.io\/en\/news\/three-ways-to-flight-authorization-2-the-operational-permit\/\",\"url\":\"https:\/\/www.flynex.io\/en\/news\/three-ways-to-flight-authorization-2-the-operational-permit\/\",\"name\":\"How do I get permission for my drone flight? - Everything about SORA & Co.\",\"isPartOf\":{\"@id\":\"https:\/\/live-new03.flynex.io\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.flynex.io\/en\/news\/three-ways-to-flight-authorization-2-the-operational-permit\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.flynex.io\/en\/news\/three-ways-to-flight-authorization-2-the-operational-permit\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.flynex.io\/wp-content\/uploads\/2021\/06\/2021-06-Aufstiegsgenehmigungen.jpg\",\"datePublished\":\"2021-07-14T14:51:12+00:00\",\"dateModified\":\"2021-07-27T08:56:25+00:00\",\"description\":\"Anyone planning a high-risk flight must apply for operational authorization. Read more about how this works and what SORA, PDRA, and STS are all about in this article.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.flynex.io\/en\/news\/three-ways-to-flight-authorization-2-the-operational-permit\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.flynex.io\/en\/news\/three-ways-to-flight-authorization-2-the-operational-permit\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.flynex.io\/en\/news\/three-ways-to-flight-authorization-2-the-operational-permit\/#primaryimage\",\"url\":\"https:\/\/www.flynex.io\/wp-content\/uploads\/2021\/06\/2021-06-Aufstiegsgenehmigungen.jpg\",\"contentUrl\":\"https:\/\/www.flynex.io\/wp-content\/uploads\/2021\/06\/2021-06-Aufstiegsgenehmigungen.jpg\",\"width\":800,\"height\":450,\"caption\":\"Abbildung Genehmigungen\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.flynex.io\/en\/news\/three-ways-to-flight-authorization-2-the-operational-permit\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.flynex.io\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Three Ways to Flight Authorization:2. The Operational Permit\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/live-new03.flynex.io\/en\/#website\",\"url\":\"https:\/\/live-new03.flynex.io\/en\/\",\"name\":\"FlyNex\",\"description\":\"Drone Data &amp; Workflow Solution\",\"publisher\":{\"@id\":\"https:\/\/live-new03.flynex.io\/en\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/live-new03.flynex.io\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/live-new03.flynex.io\/en\/#organization\",\"name\":\"FlyNex\",\"url\":\"https:\/\/live-new03.flynex.io\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/live-new03.flynex.io\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.flynex.io\/wp-content\/uploads\/2020\/06\/FlyNex_logo_blue.png\",\"contentUrl\":\"https:\/\/www.flynex.io\/wp-content\/uploads\/2020\/06\/FlyNex_logo_blue.png\",\"width\":5257,\"height\":1000,\"caption\":\"FlyNex\"},\"image\":{\"@id\":\"https:\/\/live-new03.flynex.io\/en\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/flynex.io\/\",\"https:\/\/x.com\/FlyNex_io\",\"https:\/\/www.instagram.com\/flynex.io\/\",\"https:\/\/www.linkedin.com\/company\/flynex-gmbh\/\",\"https:\/\/www.youtube.com\/channel\/UCRPBL25qUpiZ49nZpqPPnNQ\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/live-new03.flynex.io\/en\/#\/schema\/person\/4c1b16dc9ca091a761363ced757da047\",\"name\":\"Sebastian Hack\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/live-new03.flynex.io\/en\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/210d4beb40cafc8fe1355219a444c84c9ce2b7360296a83ee45ea76c6896dcc3?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/210d4beb40cafc8fe1355219a444c84c9ce2b7360296a83ee45ea76c6896dcc3?s=96&d=mm&r=g\",\"caption\":\"Sebastian Hack\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"How do I get permission for my drone flight? - Everything about SORA & Co.","description":"Anyone planning a high-risk flight must apply for operational authorization. Read more about how this works and what SORA, PDRA, and STS are all about in this article.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.flynex.io\/en\/news\/three-ways-to-flight-authorization-2-the-operational-permit\/","og_locale":"en_US","og_type":"article","og_title":"How do I get permission for my drone flight? - Everything about SORA & Co.","og_description":"Anyone planning a high-risk flight must apply for operational authorization. Read more about how this works and what SORA, PDRA, and STS are all about in this article.","og_url":"https:\/\/www.flynex.io\/en\/news\/three-ways-to-flight-authorization-2-the-operational-permit\/","og_site_name":"FlyNex","article_publisher":"https:\/\/www.facebook.com\/flynex.io\/","article_published_time":"2021-07-14T14:51:12+00:00","article_modified_time":"2021-07-27T08:56:25+00:00","og_image":[{"width":800,"height":450,"url":"https:\/\/www.flynex.io\/wp-content\/uploads\/2021\/06\/2021-06-Aufstiegsgenehmigungen.jpg","type":"image\/jpeg"}],"author":"Sebastian Hack","twitter_card":"summary_large_image","twitter_creator":"@FlyNex_io","twitter_site":"@FlyNex_io","twitter_misc":{"Written by":"Sebastian Hack","Est. reading time":"28 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.flynex.io\/en\/news\/three-ways-to-flight-authorization-2-the-operational-permit\/#article","isPartOf":{"@id":"https:\/\/www.flynex.io\/en\/news\/three-ways-to-flight-authorization-2-the-operational-permit\/"},"author":{"name":"Sebastian Hack","@id":"https:\/\/live-new03.flynex.io\/en\/#\/schema\/person\/4c1b16dc9ca091a761363ced757da047"},"headline":"Three Ways to Flight Authorization: 2. The Operational Permit","datePublished":"2021-07-14T14:51:12+00:00","dateModified":"2021-07-27T08:56:25+00:00","mainEntityOfPage":{"@id":"https:\/\/www.flynex.io\/en\/news\/three-ways-to-flight-authorization-2-the-operational-permit\/"},"wordCount":11193,"commentCount":0,"publisher":{"@id":"https:\/\/live-new03.flynex.io\/en\/#organization"},"image":{"@id":"https:\/\/www.flynex.io\/en\/news\/three-ways-to-flight-authorization-2-the-operational-permit\/#primaryimage"},"thumbnailUrl":"https:\/\/www.flynex.io\/wp-content\/uploads\/2021\/06\/2021-06-Aufstiegsgenehmigungen.jpg","keywords":["Authorization","Concept of Operation","ConOp","LBA","Operational Authorisation","Operational Permission","PDRA","permission service","Permit","Risk Assessment","SORA","Standard scenario","STS","UAS"],"articleSection":["News"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.flynex.io\/en\/news\/three-ways-to-flight-authorization-2-the-operational-permit\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.flynex.io\/en\/news\/three-ways-to-flight-authorization-2-the-operational-permit\/","url":"https:\/\/www.flynex.io\/en\/news\/three-ways-to-flight-authorization-2-the-operational-permit\/","name":"How do I get permission for my drone flight? - Everything about SORA & Co.","isPartOf":{"@id":"https:\/\/live-new03.flynex.io\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.flynex.io\/en\/news\/three-ways-to-flight-authorization-2-the-operational-permit\/#primaryimage"},"image":{"@id":"https:\/\/www.flynex.io\/en\/news\/three-ways-to-flight-authorization-2-the-operational-permit\/#primaryimage"},"thumbnailUrl":"https:\/\/www.flynex.io\/wp-content\/uploads\/2021\/06\/2021-06-Aufstiegsgenehmigungen.jpg","datePublished":"2021-07-14T14:51:12+00:00","dateModified":"2021-07-27T08:56:25+00:00","description":"Anyone planning a high-risk flight must apply for operational authorization. Read more about how this works and what SORA, PDRA, and STS are all about in this article.","breadcrumb":{"@id":"https:\/\/www.flynex.io\/en\/news\/three-ways-to-flight-authorization-2-the-operational-permit\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.flynex.io\/en\/news\/three-ways-to-flight-authorization-2-the-operational-permit\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.flynex.io\/en\/news\/three-ways-to-flight-authorization-2-the-operational-permit\/#primaryimage","url":"https:\/\/www.flynex.io\/wp-content\/uploads\/2021\/06\/2021-06-Aufstiegsgenehmigungen.jpg","contentUrl":"https:\/\/www.flynex.io\/wp-content\/uploads\/2021\/06\/2021-06-Aufstiegsgenehmigungen.jpg","width":800,"height":450,"caption":"Abbildung Genehmigungen"},{"@type":"BreadcrumbList","@id":"https:\/\/www.flynex.io\/en\/news\/three-ways-to-flight-authorization-2-the-operational-permit\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.flynex.io\/en\/"},{"@type":"ListItem","position":2,"name":"Three Ways to Flight Authorization:2. The Operational Permit"}]},{"@type":"WebSite","@id":"https:\/\/live-new03.flynex.io\/en\/#website","url":"https:\/\/live-new03.flynex.io\/en\/","name":"FlyNex","description":"Drone Data &amp; Workflow Solution","publisher":{"@id":"https:\/\/live-new03.flynex.io\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/live-new03.flynex.io\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/live-new03.flynex.io\/en\/#organization","name":"FlyNex","url":"https:\/\/live-new03.flynex.io\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/live-new03.flynex.io\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.flynex.io\/wp-content\/uploads\/2020\/06\/FlyNex_logo_blue.png","contentUrl":"https:\/\/www.flynex.io\/wp-content\/uploads\/2020\/06\/FlyNex_logo_blue.png","width":5257,"height":1000,"caption":"FlyNex"},"image":{"@id":"https:\/\/live-new03.flynex.io\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/flynex.io\/","https:\/\/x.com\/FlyNex_io","https:\/\/www.instagram.com\/flynex.io\/","https:\/\/www.linkedin.com\/company\/flynex-gmbh\/","https:\/\/www.youtube.com\/channel\/UCRPBL25qUpiZ49nZpqPPnNQ"]},{"@type":"Person","@id":"https:\/\/live-new03.flynex.io\/en\/#\/schema\/person\/4c1b16dc9ca091a761363ced757da047","name":"Sebastian Hack","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/live-new03.flynex.io\/en\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/210d4beb40cafc8fe1355219a444c84c9ce2b7360296a83ee45ea76c6896dcc3?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/210d4beb40cafc8fe1355219a444c84c9ce2b7360296a83ee45ea76c6896dcc3?s=96&d=mm&r=g","caption":"Sebastian Hack"}}]}},"_links":{"self":[{"href":"https:\/\/www.flynex.io\/en\/wp-json\/wp\/v2\/posts\/17143","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.flynex.io\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.flynex.io\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.flynex.io\/en\/wp-json\/wp\/v2\/users\/1357"}],"replies":[{"embeddable":true,"href":"https:\/\/www.flynex.io\/en\/wp-json\/wp\/v2\/comments?post=17143"}],"version-history":[{"count":0,"href":"https:\/\/www.flynex.io\/en\/wp-json\/wp\/v2\/posts\/17143\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.flynex.io\/en\/wp-json\/wp\/v2\/media\/16364"}],"wp:attachment":[{"href":"https:\/\/www.flynex.io\/en\/wp-json\/wp\/v2\/media?parent=17143"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.flynex.io\/en\/wp-json\/wp\/v2\/categories?post=17143"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.flynex.io\/en\/wp-json\/wp\/v2\/tags?post=17143"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}